Loading...

CASPIAN WATER FRONT PROJECT / BAKU 2014

Owner/Investor: Pasha Constrution Co.

Employer: Ural Mühendislik


                                       Scope of work 

                                        Connection design and consultancy

                                        3D Tekla X-Steel models

                                        Erection drawings

                                        Assembly & single part drawings